项目
The University of 德州 Rio Grande Valley is always growing. We currently have several new buildings under design and construction as well as existing areas being renovated.
爱丁堡
科学 Building (Completed in 2018)
大约115,000 gross square feet facility will serve students throughout the region and support various STEM disciplines including biology, 物理, 化学, 数学, 医学预科, 以及环境研究. The facility will increase classroom capacity and provide additional instructional and research laboratories. The project will be built with new learning technologies and constructed to provide space that is adaptable to new and future learning realities and pedagogies so that students can take courses from either 爱丁堡 or 布朗斯威尔 campuses through the use of interactive technology. This new facility is being constructed adjacent to the existing 科学 building and will connect to it. 它将包括以下内容:
- 化学实验室
- 生物学实验室
- 高压灭菌器
- 教室
跨学科的工程 & Academic Building (Completed in 2018)
大约是53,398 gross square feet facility will serve students throughout the region and support engineering and 学术 studies. The facility will increase classroom capacity and will provide additional instructional teaching labs, 计算机实验室, 以及学生和教师办公室. This new facility is being constructed adjacent to the Physical 科学 building, 图书馆南面. 它将包括以下内容:
- 工程实验室
- 计算机实验室
- 教室
School of Medicine Team Based Learning Center (Under 建设)
The 金沙中国 School of Medicine has experienced rapid growth across the clinical, 学术, 研究任务. We have hit capacity and have outgrown our current, recently constructed building since first opening our doors in the summer of 2016 on the 爱丁堡 campus. The new building will be an extension of the existing School of Medicine and will consist of a Team Based Learning interprofessional education flex room, 基于问题的教学室, private and individual student study and support space, and faculty administrative office. The design will feature flexible classrooms with modern technology which are needed to provide the kind of educational experience mandated by the accrediting board. The new building will strengthen and expand the distance learning program, which is essential for the University. 金沙中国 envisions this building to be a destination and will employ innovative and flexible modern learning environments.
布朗斯威尔
音乐,科学 & Learning Center (Completed in 2018)
大约是102,500 gross square foot facility will serve students throughout the region and support general 学术s, 音乐教学和独奏会, 科学与教学实验室, and provide flexible student and collaboration space. The facility will relocate functions currently located in leased space and will consolidate into one building creating efficiencies. 它将包括以下内容:
- 音乐练习室 & 排练大厅
- 计算机实验室
- 科学 & 化学实验室
- 教室
Interdisciplinary Academic Building (Completed in 2019)
大约55,509 gross square feet facility will serve students throughout the region and support student success departments, 一般学术研究, as well as 物理 related programs. The facility will increase classroom capacity and will provide additional instructional teaching labs, 计算机实验室, 教职员办公室. This new facility is being constructed on the south side of campus along West University Boulevard. 它将包括以下内容:
- 一般的教室
- 计算机实验室
- 数学实验室
- 物理实验室
- 教师办公室
- 学生成功部
德克萨斯州的哈林根
Institute of Neuroscience Project (Under 建设)
The University of 德州 Rio Grande Valley School of Medicine is planning, through Permanent University Funds (PUF), to construct a new Institute of Neuroscience facility that will increase the clinical and research presence in 德克萨斯州的哈林根, 德州. The facility will cost an estimated $30 million and will be built on 35 acres of land located southwest of the Clinical Education Building. The new facility advances one of the core research priorities for the 金沙中国 School of Medicine. 加起来大约是22,969 net assignable square feet and will help alleviate the current space demand in clinical and research areas. 它将容纳干燥的研究实验室, clinical and clinical research space, 核心成像, 治疗中心, 行政支持, 合作的领域, 以社区为中心的空间. 金沙中国 plans to construct an approximately 60,000 GSF facility in two to three phases, 几年之后, to be a designated center for research on brain health and other aspects of neurosciences. The current project, or first phase, is planned at approximately 32,570 GSF. The project supports the institution's Strategic Plan and conforms and adheres to the current approved 金沙中国 校园总体规划 for a distributed university model.